JAL Construction Ltd.

Click an image to open in a new browser window              Back             Go to more images

New reinforced retaining wall at Hamilton Road, Reading. Cages pre-fabricated off site & assembled on site to form curved wall, faced-up with brickwork.

Concrete wall shuttered using FRAMI panel system formwork.

 

King Edward School, Bath. Extension to classroom block. Change in levels contained by retaining wall and planting bed. Rear of bed utilising blockwork topped with sleepers, face of bed contructed from sleepers with seating attached to front face.

 

 



 

  Tyco Electronics, Swindon. Existing section of factory floor  removed to install new piled foundations and reinforced slab to accomodate new machinery and crane bases.                                          

                      Finished floor concreted to match existing ->






 

 

New footpath constructed inside Defence Academy at Shrivenham. Existing grass banks excavated and replaced with edgings to form new footpath. Path filled with MOT type I and surfaced with tarmac.

 

 




 

New footpath constructed inside Defence Academy at Shrivenham. Existing grass banks excavated and replaced with edgings to form new footpath. Path filled with MOT type I and surfaced with tarmac.

 

 

 

 

 

  Park School, Thatcham.

 New classroom extension. Standard mass fill foundation, hardcore fill, mesh reinforcement, RC35 concrete finished to accept screed

Works started during half term to minimise disruption to classes. All work needing large plant completed during half term.

 

 

 

Home I  Services   I  Gallery  I  Links  I  Contact Us