|
JAL Construction Ltd.
Click an image to open in a new browser window Back Go to more images
|
Harefield School, Southampton.
Constrcution of external play areas to Surstart Centre with tarmac surface with UPVC canopies over. Grassed areas prepared and turfed during summer holidays, ready for use in new Autumn Term
|
Rear of Surestart Centre, Harefield School, Southampton.
Site office & canteen removed to allow external areas to be prepared for turfing.
|
|
|
Farley Equestrain Centre, Rowes Farm, Swallowfield, Nr. Reading.
New stables block created alongside of new riding arena. DPM, A252 mesh reinforcement, RC35 concrete finished with easy float to accept new rubber flooring mats.
|
|
|
Farley Equestrain Centre, Rowes Farm, Swallowfield, Nr. Reading.
New indoor riding arena. Floor levelled with 150mm type 1 limestone, rolloed to close surface, capped with rubberised sand as riding surface.
|
|
|
Costellol School of Technology, Basingstoke
Access route to site deterioted due to back weather (even using trackmats). Track mats lifted, topsoil removed and sidecast, terram laid to 1st half of access road with type 1 topping.
|
|
|